Custom service

PNA Nucleobase Modification

Install modified nucleobases on pna strands to adjust pairing and fluorescence

Turnaround: 4–7 weeksTypical scale: 0.5 mg – 1 g modified peptideChemistry options: base-discriminating fluorescent bases; G-clamp and pseudo-complementary bases; modified-base building-block sourcing

Teams come to this service when they need to install modified nucleobases on PNA strands to adjust pairing and fluorescence. We typically start from base-discriminating fluorescent bases, add G-clamp and pseudo-complementary bases where the application demands it, and close the loop with modified-base building-block sourcing so the final modified-base PNA with pairing data sheet behaves consistently across lots.

Design reviews are part of the schedule, not an extra. Sequence, spacer architecture and analytical strategy are signed off before the first synthesis run, which is why the 4–7 weeks timeline holds in practice.

SNV-discrimination probes

Fluorescent turn-on PNA sensors

Base modifications requiring unlicensed proprietary monomers

Modifications requiring radiological or BSL-3 containment

Modified peptides are released against a specification that includes site occupancy. Where a modification is labile (sulfation, glycosylation, phosphorylation), we use fragmentation data rather than mass shift alone to assign the site, and we state detection limits for any positional isomers that co-elute.

Service Highlights

  • Base-discriminating fluorescent bases as the default route, with G-clamp and pseudo-complementary bases held as a proven fallback
  • Modified-base building-block sourcing worked into the design where the application requires it
  • Modification sites are mapped on the sequence and confirmed by MS/MS before release
  • Analytical confirmation of every intermediate before the final release
  • Modified and unmodified species are separated and quantified, not just reported
  • Modified-base PNA with pairing data sheet delivered with a complete conjugation or synthesis certificate

How the work runs

  1. Sequence & modification map

    We annotate every modification site, protection strategy and analytical target before synthesis starts.

  2. Solid-phase assembly

    The chain is built with Fmoc chemistry, inserting modified or unnatural residues at the mapped positions.

  3. Modification chemistry

    Post-synthesis steps — base-discriminating fluorescent bases, G-clamp and pseudo-complementary bases — are run under conditions validated on a test cleavage.

  4. Cleavage & purification

    Global deprotection and cleavage are followed by RP-HPLC purification to the agreed purity.

  5. Analytical release

    Purity, identity and modification ratio are confirmed by HPLC, MS and MS/MS site mapping.

  6. Documentation

    Modified-base PNA with pairing data sheet is released with the batch record and analytical package after QC sign-off.

Specifications & timeline

Turnaround
4–7 weeks
Typical scale
0.5 mg – 1 g modified peptide
Chemistry options
base-discriminating fluorescent bases; G-clamp and pseudo-complementary bases; modified-base building-block sourcing
Deliverable
Modified-base PNA with pairing data sheet
QC package
HPLC purity, ESI/MALDI MS, MS/MS site mapping, modification ratio
Shipping
Ambient or blue ice as stability data dictate

Related Products

Next step

Tell us the target, we will tell you what is feasible

Send the sequence, assay format and sensitivity you need. You will get a technical assessment — recommended platform, timeline and the risks worth knowing before you commit budget.